Image Loading

Solid Control Project Coordinator (Office Based)

Brurecruit      Jalan Sungai Pandan, Kuala Belait

By Brurecruit Jobs

Job Description

- This position's responsibilities will include but not be limited to advise and monitor on Cuttings Dryer, shakers, hydro cyclones, centrifuges, and other that related to solid control and waste management.
- Monitor on retained-on-cuttings (ROC) analysis for SBM cuttings from shakers and centrifuge.
- Maintain record of quantities of mud volume recovered for re-use, cutting volume and Small Volume Discharges.
- Perform a site visit for each new location whenever requested by Client and to submit report on the equipment lay-out and change proposal (if any) to accommodate the equipment at the new location including SBM “Zero-Spill” Rig audit survey.
- Solid Control Project Coordinator shall complete diploma with a minimum of seven (7) years rig site experience in operating solid control equipment.

Skills

  • technical communication
  • Analytical Skills
  • coordination

Education

  • BSc in Engineering/ Chemistry

Job Information

Job Creation Date

24/07/2025

Experience

3-4

Offered Salary

Undisclosed

Work Type

Contract

Type of Work

8 hour shift

Multiple Country Preferences

Brunei Darussalam

Location Address of Job

Kuala Belait

Category

Oil & Gas

No of Hires

1

Application Ends:

24/08/2025

Copyright © 2022 All Rights Reserved. BRURECRUIT