- Solid Control Engineer to operate the Cuttings Dryer, shakers, hydrocyclones, centrifuges, etc.
- Retained-On-Cuttings (ROC) analysis for NAF cuttings from shakers, Dryer and centrifuges.
- Conduct rheological mud properties check on the recovered mud for re-use.
- Mud and cuttings samples shipping and record keeping.
- Maintain records of quantities of mud volume recovered for re-use, cutting volume and Small Volume Discharges.
- Prepare end of well summary reports.
- Check good functioning of the solid control equipment.
- Ensuring maintenance of equipment is in place and as per schedule.
- Solid Control Engineer shall complete high school education with a minimum of five (5) years Rig site experience in operating solid control equipment.